Living along Colorado’s Front Range means your garage floor is exposed to sun, snow, and extreme temperature swings. A properly installed garage floor coating should withstand it all, but many don’t.
Here are five of the most common reasons coatings fail prematurely.
Missing the Moisture-Mitigating Epoxy Layer
Concrete in Colorado garages absorbs groundwater and releases vapor. Without a moisture-mitigating epoxy primer, that vapor breaks the bond between the floor and the coating. The result? Peeling and bubbling that no amount of surface prep can fix.
Hot Tire Transfer After Mountain Drives
After long climbs, highway return trips, or even everyday errands, tires arrive in the garage very hot. On low‑quality systems, that heat softens the topcoat and lets plasticizers from the rubber migrate into the film. Those plasticizers—along with road grime—embed in the softened surface, causing dark tire marks, discoloration, and tackiness that only get worse over time.
Sunlight Beaming Into Open Garages
Colorado is famous for its sunshine. Unfortunately, UV rays can yellow or chalk standard epoxy finishes. A durable garage floor coating relies on UV-stable polyaspartic topcoats that preserve color and gloss even with frequent exposure.
Impact and Abrasion from Active Garages
From skis and snowboards to mountain bikes and tools, Colorado garages are high-use spaces. Thin coatings are prone to chipping and scratching under heavy activity. A full-flake broadcast with dual polyaspartic top layers creates an impact-resistant garage floor coating built for active lifestyles.
Road Salt and Harsh Chemicals
Winter driving brings magnesium chloride and road salt into the garage, and spills from oil, fuel, or cleaners can make matters worse. Unless your coating is engineered for chemical resistance, stains and surface breakdown are inevitable.
Get a Garage Floor Coating Built for the Front Range
Your Colorado Springs garage deserves a coating that holds up in every season. At Garage Floor Coating of the Front Range, we install advanced 2-day systems with a 100% solids moisture-mitigating epoxy primer coat, two polyaspartic topcoats for UV, chemical, and abrasion resistance, and a lifetime warranty against delamination.
Call today to schedule your free consultation.